In 2025, the Wonsan Kalma Coastal Tourist Area opened as North Korea’s first international-scale seaside resort, drawing structural and conceptual inspiration from high-capacity Mediterranean destinations like Spain’s Benidorm.
Tasked with developing the 38,000 sqm aquatic epicenter for this $120 Million USD mega-project, the developers required a turnkey partner capable of executing flawless master planning for extreme daily capacities.
Dalang was selected to lead the design, manufacturing, and installation guidance, delivering a world-class facility from concept to grand opening in under 10 months.
Case Background: What Challenges Ahead?
Following the official research, the goal was to build a “Benidorm-style” resort on a sandy coastline stretching roughly four kilometers along the Kalma Peninsula.
However, anchoring a resort of this magnitude required a high-throughput attraction capable of handling a peak daily capacity of 8,000 guests. The core challenge for Dalang was two-fold:
- Extreme Throughput Logistics: How to move 8,000 daily visitors through a 38,000 sqm footprint without creating operational bottlenecks.
- Cultural and Aesthetic Integration: The design mandate required a “people-first” philosophy that blended modern marine leisure with local North Korean aesthetic values. The resort demanded rustic, pure colors that integrated naturally with the seaside environment, actively avoiding the overly flashy, neon palettes typical of western water parks.
How’s the Plan?
To manage the massive 8,000-guest daily capacity, Dalang engineers utilized strategic zoning to separate kinetic energy levels, using the massive Lazy River as both a physical and psychological boundary.
- The Inner Core (High Adrenaline): Inside the perimeter of the Lazy River, Dalang concentrated the massive, high-throughput thrill rides. This kept the loudest, most extreme adrenaline zones contained within a centralized hub.
- The Outer Perimeter (Family & Leisure): On the right side of the river, Dalang positioned the family interactive zones, standard pools, and surf simulators.

This strict separation of “Dynamic” and “Static” zones ensured that thrill-seekers and families had dedicated spaces. More importantly, the precise structural spacing between the massive fiberglass flumes ensured that guest circulation, VIP routes, and backend maintenance access streams never intersected, allowing the park to run smoothly even at peak capacity.
Wonsan Water Park Attractions
Extreme Adventure & Challenge Zone
Family Fun & Trendy Sports Zone
During Delivery: Stringent Timeline + Strict Requirement
Moving from initial design in September 2024 to a successful grand opening in June 2025 is an aggressive timeline for a 38,000 sqm park.
Dalang achieved this through their 100,000 sqm intelligent manufacturing hub. By utilizing European 5-axis CNC machines and L-RTM closed-molding technology, Dalang produced ultra-precise, double-sided smooth fiberglass flumes.
The high precision guaranteed that when the massive structural pieces arrived on the coast, they fit together perfectly during the installation phase, ensuring Factory Acceptance Testing (FAT) compliance and eliminating costly on-site delays.
Secure Your Next Landmark Project with Dalang
The success of the Wonsan Water Park proves that high-capacity resort infrastructure requires a partner who understands the intricate balance of guest flow logistics, extreme structural engineering, and aesthetic integration.